Engineered for Smart Water & Energy Solutions
Shenzhen Boray Technology Co., Limited logo Request a Quote

Engineering guide

How To Solve Motor Inrush Current Overload In Large Submersible Pumps

Motor inrush current overload in large submersible pumps can be reduced with controlled starting, properly sized pump drives, and suitable solar pump inverter selection.

Understanding Inrush Current in Large Submersible Pumps

Large submersible pumps can draw high starting current when energized directly, causing overload trips and voltage dips. In industrial and solar pumping installations, this surge can stress the power source and control equipment. Proper starting and drive control reduces the shock to motors and circuits.

Why Soft Starting and Pump VFDs Help

Soft starters and pump VFDs ramp voltage and frequency gradually, lowering starting current and mechanical stress. For submersible applications, this helps avoid electrical overload and abrupt torque spikes. The FS300 Series Intelligent Pump AC Drive and ST300 Online Soft Starter Cabinet can be considered when controlling large water pumps.

Sizing the Drive or Inverter for Motor Starting

Select equipment based on motor full-load current, starting torque, pump type, cable length, and source conditions. A drive or inverter should have enough overload capability and control response for the pump load. Accurate sizing helps maintain stable operation during start-up and normal running.

Using Solar Pump Inverters in Pumping Installations

In solar-powered pumping, the inverter must coordinate PV power, motor load, and start-up demands. The BR600-P Solar Pump Inverter can be considered for direct solar pump control when it matches the pump and motor requirements. For systems that also need grid or battery backup, a hybrid solar inverter architecture should be evaluated during design.

Practical Checklist Before Commissioning

Verify motor nameplate data, pump curve, starting sequence, protection settings, and wiring before energizing. Test acceleration, overload thresholds, and fault behavior under controlled conditions. Document settings so maintenance teams can repeat reliable starts.

Apply this to your project

Send the motor ratings, duty and site conditions and Boray will specify the series.

Email the engineering team All contact details